Successful Test Lifting of Pamban Bridge Resumes Rameswaram Island Connectivity

Wednesday, 2 October 2024, 09:53

Pamban Bridge has successfully completed its test lifting, marking a crucial step for rail connectivity between Rameswaram island and the Indian mainland. This new vertical lift rail bridge by RVNL replaces the previous cantilever structure, enhancing transportation efficiency to Tamil Nadu's popular tourist destination.
Deccanherald
Successful Test Lifting of Pamban Bridge Resumes Rameswaram Island Connectivity

Pamban Bridge Achieves Test Lifting Milestone

In a pivotal development for India News, the successful test lifting of the Pamban Bridge signals a promising return of rail services between Rameswaram island and the Indian mainland. Conducted by Rail Vikas Nigam Limited (RVNL), this first vertical lift rail bridge, a first for India, underwent trials to facilitate large boats' passage. The 2.07-km structure will replace the iconic cantilever bridge, closed since December 2022 due to structural cracks.

Details on the New Pamban Bridge

  • The new bridge includes 100 spans, with specific lengths to ensure navigational clearance.
  • Work began in 2020 but faced delays due to the Covid-19 pandemic.
  • This modern bridge rises three meters higher than the previous structure built in 1914.

With trains currently terminating 20 km from Rameswaram at Mandapam, this development not only revitalizes rail connectivity but also enhances accessibility for visitors and devotees to the revered island.


This article was prepared using information from open sources in accordance with the principles of Ethical Policy. The editorial team is not responsible for absolute accuracy, as it relies on data from the sources referenced.


Related posts


Newsletter

Subscribe to our newsletter for the latest insights and trends from around the world. Stay informed and elevate your global perspective effortlessly.

Subscribe